Find how current a model is
Read the Modeled through date of a model and open the run status panel to see when the model last ran.
The Modeled through date tells you the last date that a model has results for. You can read the date on the overview, on a detail page, and on the Attribution page.
Read the date on the overview
Section titled “Read the date on the overview”-
Select Model Center in the sidebar.
-
Find the card of the model.
-
Read Modeled through: in the footer of the card.
A dash in place of a date means that the model has no results yet.
See when a model last ran
Section titled “See when a model last ran”The run status panel of a detail page shows the status and the times of the last run.
-
On the overview, select the card of the model.
-
In the header row of the detail page, hold the pointer over the help icon next to the config.
The run status panel opens.
-
Read the rows of the panel.
| Row | What it shows |
|---|---|
| Last run | The status of the last run. |
| Run started | The start time of the run. The row shows only when a start time exists. |
| Est. finish | The estimated finish time. The row shows only while a run is in progress. |
| Last run completed | The time that the last run finished. The row shows Not run when no run finished. |
| Average runtime | The average duration of a run. The row shows Unknown when no value exists. |
| Modeled through | The last date that the model has results for. The row shows Not available when no date exists. |
The Last run row shows Completed, Running, Failed, Skipped, or Not run. See Run statuses.
Read the date from Attribution
Section titled “Read the date from Attribution”The Attribution page shows a Modeled through date in two places: next to the date range, and in the footer of the Performance Table. Each one is a link to Model Center.
Next steps
Section titled “Next steps”- Read the health of a model: check the fit of the model through its latest date.
- Choose what Attribution shows: set the date range of the Attribution page.