Skip to content
Open Prescient AI
Data Center

How an Admin lays a Google Sheet of extra rows over a connected channel in Data Center, tests the sheet, and removes the patch.

To add a data patch, open the menu of a connected channel on the Channels tab, select Data patch, give a Google Sheet and a named range, then select Save & Test. Use a data patch to add rows that the connection does not have, for example ad spend from before the account was connected.

You must be an Admin. For what a patch is and which channels can take one, see Data patches.

  1. Make a Google Sheet with the columns of the type of the channel. See Data requirements.

    In a patch, the key columns are required and the main metric columns are optional. A patch sheet always uses the Google Sheets column names, so the expected name of the date column is created_date. Data Center also accepts date.

  2. Make a named range that covers the rows, with the header row.

  3. Share the sheet with Prescient. The left side of the Data patch dialog shows the sharing instructions. To read them, open the dialog with the first two steps of the next section.

  1. On the Channels tab, select the menu at the end of the row of the channel.

  2. Select Data patch.

    The item is available only for a channel that can take a patch.

  3. Paste the address of the sheet in Patch sheet URL.

  4. Select Find ranges, then select the range in Named range.

  5. Select Save & Test.

Data Center runs the same three checks as for a Google Sheets channel. When the checks pass, the dialog shows Data patch validated and the row of the channel shows the badge Patch.

Open Data patch again to see the sheet, the range, and the result of the last test.

StateWhat it means
Patch validatedThe last test passed. The line below gives the count of rows and the date of the test.
Patch failingThe last test failed. Correct the sheet and select Re-test.
Not tested yetThe patch is saved and has no test result.

When the last test failed, the row of the channel shows the badge Patch failing. Correct the sheet, then select Re-test.

  • To use a different sheet or range, open Data patch, select Edit, change the values, then select Save & Test. A change drops the last test result.
  • To remove the patch, open Data patch, select Remove patch, and confirm. Data Center stops the use of the sheet. The sheet itself is not changed.